Two ways to get your ready PVC bill.

Indian Railway contractors — use the full web app, or get your PVC in seconds on Telegram.

Web app · AI extraction

Upload the bill PDF,
get a ready PVC bill.

Upload your signed bill PDF and let AI extract the schedules, quantities, rates and classifications — or enter them yourself. IR Standard statements, bulk billing, live indices, full Hindi (हिन्दी) support.

AI PDF Extraction IR Standard PDF Bulk Bills
New · Telegram

Get your PVC
right inside Telegram.

No login, no forms. Send your agreement and running bill PDFs to the bot and get the PVC amount in seconds — pay in chat for the full IR statement.

  • PVC amount free — no account needed
  • Reads & classifies the bill automatically
  • Official IR statement with index docs
  • Pay by UPI / card, right in the chat
Southern Railway Contractors Association

Developed for Southern Railway Contractors Association, Tiruchirappalli Division · Powered by ILLALL TECH

Everything You Need for PVC

From contract creation to IR Standard statements — every step automated, accurate, and fast.

New

AI PDF Bill Extraction

Upload your signed railway bill PDF and let AI read it — schedules, current quantities, agreement rates, work classifications, and cement/steel calculations, all laid out for a quick review. Works for single bills and bulk uploads. Extraction and preview are free.

Automated PVC Bills

Create comprehensive running account bills instantly. The system automatically calculates PVC formulas per GCC Clause 46A, applying correct quarterly indices without any manual spreadsheet entry.

IR Standard PDF

NEW

Generate official GCC Clause 46A PVC statements in Indian Railway standard format — with formula display, fixed component row, monthly index history, provisional watermark, and affected-indices-only tables.

Bulk Bill Creation

NEW

Submit multiple bills in one shot. Set zone and fuel basis once for all bills, enter classification-based amounts per row, and download individual or combined PDF reports in Detailed or IR Standard format.

Steel Forecast

Plan billing timing with advanced quarterly steel projections. Predict future index values based on historical JPC rates and market trends.

Index Tracking

Always up to date. We track PPAC diesel prices, steel JPC rates, and all 10 component indices required for GCC calculations, with full monthly history and trend charts.

Extension Compliance

Handles 17A / 17B extension clauses automatically. Dedicated steel and cement PVC components, correct index selection per extension type, and proper cumulative tracking across all bills.

How It Works

A streamlined workflow designed to get your PVC statements generated in under 5 minutes.

01

Add Contract

Enter agreement details, base month, zone, and extension type. The system validates against Railway norms automatically.

02

Add or Upload Bill Data

Upload your signed bill PDF and let AI extract the items automatically, or add line items by classification yourself. Bulk upload multiple bills at once with shared zone and fuel settings.

03

Auto Calculation

Our engine fetches current indices from official sources and computes PVC per GCC Clause 46A instantly — no manual lookups.

04

Export PDF

Download in Detailed Report or IR Standard Format (GCC Cl.46A proforma with monthly indices, formula, and fixed component row). Share via WhatsApp.

Why it matters

The CAG found ₹1,172 crore in wrong PVC payments.

Auditing 886 Railway works contracts, the Comptroller & Auditor General found excess and short payments of price variation across every zone — from wrong base months to wrong component percentages. These are exactly the errors IR-PVC computes out of existence.

₹20.26 cr

excess paid from the wrong base month after tender negotiations

Base month is derived and checked on every bill

₹206.88 cr

avoidable PVC paid during extended contract periods

17-A / 17-B extension rules applied automatically

₹11.10 cr

excess from wrong formulas, percentages and indices

Fixed GCC 46A tables and published indices — nothing typed by hand

66 contracts

computed PVC on the wrong quarter

The quarter is calculated from the base month, never chosen

Source: Comptroller & Auditor General of India, Report No. 5 of 2021 (Railways), Chapter 3, paras 3.1.5–3.1.6 — audit of Price Variation in Works Contracts, 2016-17 to 2018-19. Figures are the CAG's; IR-PVC is an independent tool and is not endorsed by the CAG.

The Ultimate Contractor Toolkit

More than a calculator. A complete ecosystem for Indian Railway PVC management.

Free Trial

New

First PVC bill is completely free for every new user — no credits needed, watermarked PDF

IR Standard PDF

New

Official GCC Cl.46A statement with monthly indices, formula, and provisional watermark

Bulk Bill Creation

New

Create and submit multiple bills simultaneously with one-time zone & fuel setup

Bulk PDF Download

New

Download Detailed or IR Standard PDFs for multiple bills merged into one file

Excel Contract Import

New

Import multiple contracts at once via Excel/CSV template — saves hours of manual entry

Free PVC Preview

New

See the full PVC breakdown before paying — no credits deducted for preview calculations

Telegram Bot

New

Send agreement + bill PDFs to @Pvcbill_bot and get the PVC in chat — no login, pay per report

WhatsApp Integration

Receive bills and critical alerts directly on WhatsApp

Deep Analytics

Custom abstract reports and visual summaries across contracts

Bilingual Support

New

Switch seamlessly between English and Hindi (हिन्दी) across all dashboards, contracts, and bills

GST Billing

18% GST applied transparently on credit top-ups with full invoice generation

Extension Compliance

17A / 17B rule engines with dedicated steel and cement PVC

Mobile First

Fully responsive design for on-site field access

Simple, Transparent Pricing

Credit-based pay-as-you-go. Top up your wallet, use credits per bill. No subscriptions, no lock-in.

🎉

Your first bill is completely FREE

New users get one free PVC bill as a trial. No payment or credits needed — applied automatically.

Per Bill Credit Cost

Manual entry

199/ bill

AI PDF auto-extract

499/ bill

First bill FREE — one-time trial automatically applied for new users

You are charged only when a bill is saved. Enter it manually, or upload the bill PDF and let AI extract the items automatically (higher rate). Credits never expire.

Free PVC preview before paying All PDF formats (Detailed + IR Standard) Bulk bill creation at the same per-bill rates PVC check credit applied if checked recently

Credit Top-Up

Top-up amountYour choice
GST (18%)Added on top
GST Invoice Auto-generated
Credits expireNever
Add-on Subscription
Advanced Contractor Tools

PVC Check & Work Class Analyzer

Unlock unlimited access to the dynamic PVC Check tool and Classification Comparison Analyzer. Run unlimited checks with zero per-event fees!

₹99/ month

Charged from credit wallet

Ready to Streamline Your Billing?

Join smart railway contractors across India who use IR-PVC to save hours, eliminate errors, and generate Railway-standard PVC statements instantly.

First bill FREE · Free PVC preview · Pay-as-you-go credits · GST invoices included